Intraday

Multi-Site Coverage Coordination Playbook

How to rebalance staffing across locations while protecting both receiver and donor sites.

  • Scope: Intraday
  • Built for practical day-to-day operations
  • Time to apply: 15-30 minutes
  • Updated: recently

Use this when risk is uneven across sites and one local fix is not enough.

Goal

Lower total network risk without pushing the donor site into avoidable instability.

Run this play

  1. Rank site risk with one shared scoring rule.
  2. Apply transfer rules with donor floor checks.
  3. Lock rollback owner and review checkpoint.

Transfer ladder (practical order)

  1. Local shift swap within site: lowest network disruption.
  2. Short cross-site role block: use when receiver is critical and donor stays safe.
  3. Controlled service scope reduction: pause low-priority tasks at receiver.
  4. Regional escalation: when no safe transfer path remains.

First 45-minute execution map

0-15 minutes

  • Score all sites in one risk table.
  • Name one network decision owner.

15-30 minutes

  • Execute one transfer move with donor floor validation.
  • Publish owner and rollback trigger for both sites.

30-45 minutes

  • Re-check queue-age direction at donor and receiver.
  • Keep, adjust, or rollback based on pre-set criteria.

Communication rules that reduce confusion

  • One network update channel for confirmed decisions.
  • Every transfer message includes rollback owner and time.
  • Receiver and donor status are always reported together.

Watch for this

  • Donor floor checked once, then ignored.
  • Transfer started with no rollback owner.
  • Network-level decision delayed by local-only debate.

Containment success criteria

  • Critical receiver site improves within one cycle.
  • Donor site remains above floor for the full transfer window.
  • Next risk window is already staffed and owned.

See the detailed workflow: Multi-Site Coverage Coordination Workflow